Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Riviera.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Riviera.

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Plastering works.
Plastering of internal walls.

2. Block A. Installation of engineering systems.
Electrical installation works.

3. Block A. Installation of stained glass structures.
Installation of stained-glass windows and glass.

4. Block A. Masonry works.
Ceramoblock masonry of basement contour walls.

5. Block A. Arrangement of monolithic belts on the roof.
6. Block B. Plasterboard frame installation works.
Arrangement of guide frames of GKL partitions.

7. Block C. Installation of engineering systems.
Sewerage and ventilation system installation.

8. Block E. Installation of engineering systems.
— Installation of hot and cold water supply system.
— Fabrication of metal structures for storm water drainage.

9. Block E. Chimney installation.
Manufacturing of pipe frames.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news