Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Riviera.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Riviera.

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Plastering works.
Plastering of internal walls.

2. Block A. Masonry work.
Ceramoblock masonry, technical floor.

3. Block A. Installation of engineering systems.
Electrical installation works.
4. Block B. Plasterboard frame installation works.
Arrangement of guide frames of GKL partitions.

5. Block E. Installation of stained glass structures.
Arrangement of jambs.

6. Block E. Installation of engineering systems.
— Installation of hot and cold water supply system.
— Fabrication of metal structures for storm water drainage system.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news