Wyndham Grand Batumi Gonio. Riviera.
1. Block A. Plastering works.
Plastering of internal walls.
2. Block E. Installation of engineering systems.
— Installation of hot and cold water supply system.
— Electrical installation works.
— Installation of ventilation system.
3. Waterproofing works on the terraces.
4. Manufacturing of metal embedded fasteners under the balcony fences.
5. Infrastructure building.
— Plastering of the roof parapet.
— Laying of ceramic block.