Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Waterproofing.
Insulation installation on the terraces of the 3rd floor.

2. Block E. Installation of fire-places.
Installation of flue stacks.

3. Block E. Plastering.
Facade plastering.

4. Block E. Plastering.
Facade plastering.

5. Infrastructure building
Formwork installation for pouring of cast-in roof decks and columns.