Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Riviera.

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Riviera.

Wyndham Grand Batumi Gonio. Riviera.

1. Block B. Installation of storm drainage system.
Installation of storm sewer boxes.

2. Block A. Plastering.
Plastering of the facade.

3. Block E. Installation of engineering systems.
Electrical installation works, marking, fixing of clips, wiring of cables.

4. Block E. Drainage system installation.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news