Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Riviera

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Riviera

Wyndham Grand Batumi Gonio. Riviera

1. Block B. Plastering Works
Plastering of interior walls.

2. Block A. Mock-up Works
Electrical installation.

3. Block A. Installation of Engineering Systems
Completion of sewage and ventilation system installation.

4. Block E. Installation of Glazing Structures
Slope finishing and stained-glass installation.

5. Block A. Installation of Glazing and Glass Panels.

6. Block A. Floor Screed Installation on Terraces
Screed pouring.

7. Block A. Waterproofing Installation
Works on balconies.

8. Block B. Installation of Drywall Frame
Installation of guiding frames for drywall partitions.

9. Block B. Fireplace Installation
Chimney installation.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news