Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Riviera.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Riviera.

Wyndham Grand Batumi Gonio. Riviera.

1. Block B. Plastering works.
Plastering of internal walls.

2. Block A. Installation of formwork and reinforcement frames for contour walls, technical floor.

3. Block A. Plasterboard frame installation works.
Arrangement of guide frames of GKL partitions.

4. Block A. Mocap works.
Installation of electrics.

5. Block A. Installation of engineering systems.
Completion of works on installation of sewerage and ventilation system.

6. Masonry works.
Ceramoblock masonry, technical floor.

7. Block A, E. Installation of stained glass structures.
— Installation of slopes.
— Installation of stained-glass windows and glass.

8. Block A, B, E. Installation of waterproofing.

9. Block B, C. Installation of fireplaces.
Installation of chimneys

10. Infrastructure building.
Installation of stairwell floor slab formwork.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news