Wyndham Grand Batumi Gonio. Riviera.
1. Block C, E. Facade works.
— Facade insulation, installation of mineral wool.
— Installation of soffits.
2. Block E. Drilling of engineering holes.
For further installation of engineering systems.
3. Block B. Installation of storm water drainage on the terraces of townhouses.
4. Waterproofing works.
Preparatory work for waterproofing on the terraces of townhouses.