Wyndham Grand Batumi Gonio. Riviera.

1. Block C. Plastering works.
Plastering of internal walls.

2. Block A. Installation of formwork and reinforcement frames for contour walls, technical floor.

3. Block A. Plasterboard frame installation works.
Arrangement of guide frames for GKL partitions.

4. Block A. Installation of engineering systems.
Plumbing and electrical installation works.

5. Block A, C. Installation of fireplaces.
Arrangement of chimney pipes frame.

6. Block B, E. Installation of stained glass structures.
— Arrangement of slopes.
— Installation of stained-glass windows.

7. Block A. Masonry works.
Ceramoblock masonry, technical floor.

8. Block B. Waterproofing.
Installation of spray waterproofing.

9. Infrastructure building.
Dismantling of the stairwell floor slab formwork.