fbpx

Wyndham Grand Batumi Gonio. Riviera.

1. Block E. Plastering.
Plastering of inner walls on the 1st floor.

2. Block A. Glazing and installation of stained glass windows

3. Block E. Insulation of the terraces.
Screeding on the 3rd floor.

4. Infrastructure building
Formwork installation for pouring of cast-in roof belt and columns.

5. Blocks, А, В, Е. Roofing.