Wyndham Grand Batumi Gonio. Riviera.
1. Block E. Plastering.
Plastering of inner walls on the 1st floor.
2. Block A. Glazing and installation of stained glass windows
Units 3, 4
3. Block A. The formwork removal from the columns.
Work is ongoing on the 3rd floor, the terrace.
4. Block E. Insulation of the terraces.
Screeding on the 3rd floor.
5. Infrastructure building
Formwork installation for pouring of
6. Blocks, А, В, С, Е. Roofing.