Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Riviera.

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Riviera.

Wyndham Grand Batumi Gonio. Riviera. — 1. Laying of ceramic block. Block B on the 3rd floor, Block C on the 2nd floor, Block E on the 3rd floor on the terrace Laying ceramic blocks in compliance with technology. Ensuring the evenness and verticality of the walls. Checking all joints and corners for compliance with design requirements. 2. Block E. Pouring of columns on the terrace, on the 3rd floor 3. Block B. Pouring of monolithic sidewalls for stained glass windows, on the 3rd floor Includes preparation of the base, installation of formwork, uniform pouring of concrete and ensuring its curing to create a strong sidewalls.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news