Wyndham Grand Batumi Gonio. Riviera.
1. Plastering.
— Plastering of inner walls in Block C on the 1st — 3rd floors.
2. Block B. Ongoing formwork installation for staircases.
It helps to create the exact shape and geometry of the staircase, to maintain the concrete until it hardens, to ensure surface quality and structural safety.
3. Block A. Installation of insulation system on the terraces.
Screeding on the terrace of the 3rd floor in units 3–4.
4. Block A. Waterproofing
On the 3rd floor, units 5–9.
5. Block E. Drywall frame installation.
Installation of guides for drywall partition frames.
6. Block A. Installation of steel chimney framing on the terrace.
Units 1–5