fbpx

Wyndham Grand Batumi Gonio. Riviera.

1. Plastering.
— Plastering of inner walls in Block E, the 1st- 3rd floors.

2. Block B. Staircases installation.
— Pouring of inside staircases.

3. Block A. Installation of utilities systems.
Installation of engineering openings for gas pipeline, installation of sleeves.

4. Waterproofing.
On the terraces.

5. Infrastructure building.
— Column reinforcement.
— Formwork installation for the cast-in belt on the roof.