fbpx

Wyndham Grand Batumi Gonio. Riviera.

1. Plastering.
— Plastering of inner walls in Blocks A, E, B the 1st- 3rd floors.

2. Block B. Installation of staircases.
Formwork installation for the inside staircases.

3. Masonry works.
Ceramic block installation, basement.