fbpx

Wyndham Grand Batumi Gonio. Riviera.

1. Plastering.
— Plastering of inner walls in Blocks E, B the 1st- 3rd floors.

2. Block A. Facade works.
— Facade plastering.

3. Block B. Installation of staircases.
Formwork installation for the staircases.

4. Block A. Masonry works.
Ceramic block installation.