Wyndham Grand Batumi Gonio. Riviera.
1. Plastering.
Plastering of inner walls in Blocks E, B the 1st- 3rd floors.
2. Block B. Installation of staircases.
Formwork installation for the inside staircases.
3. Block A. Plastering.
Townhouses 2 and 7.
4. Masonry works.
Ceramic block installation, basement
Due to weather conditions, no other construction work is underway at the site.