fbpx

Wyndham Grand Batumi Gonio. Riviera.

1. Plastering.
Plastering of the walls inside the buildings A.

2. Block A. Installation of fireplaces.
Installation of fireplace chimneys.

3. Block A. Masonry works.
Ceramic block installation in the basement.

4. Block E. Installation of the utilities.
Plumbing — sewage system installation

5. Block E. Facade works.
Facade plastering.

6. Block A. Installation of stained glass windows.
Installation of window jambs and stained glass windows.