Wyndham Grand Batumi Gonio. Riviera. — The following key milestones are being accomplished during construction activities in Blocks A, B and C: 1. Block A, Block B, Block C. Ceramoblock masonry. Ceramoblock masonry in openings at 1st floor in Block A, 3rd floor in Block B and 1st floor in Block C is performed. Including quality control to achieve design dimensions. 2. Removal and installation of stairway formwork. Dismantling and installation of staircase formwork includes careful removal of old formwork, design and installation of new framing system with panels, quality control and preparation for concrete pouring, ensuring the strength and durability of the structure. 3. Unit B. Fireplace Masonry. Carries out masonry fireplaces, ensuring compliance with the design and high quality of execution.