Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Riviera.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Riviera.

Wyndham Grand Batumi Gonio. Riviera. — The following key milestones are being accomplished during construction activities in Blocks A, B and C: 1. Block B, Block C. Ceramic block masonry The ceramic block masonry on the 3rd floor in Block B and on the 1st floor in Block C is performed. Including quality control to achieve design dimensions. 2. Block B. Fireplace masonry Fireplace masonry is performed, ensuring conformance to design and high quality workmanship. 3. Drilling of engineering holes Marking and drilling is carried out, which is necessary for the installation of utilities for the future hotel complex.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news