Wyndham Grand Batumi Gonio. Villas.
1. Continuation of column reinforcement work, Villa 16.
It ensures the strength and stability of the columns, preventing deformation and enhancing the durability of the structure.
2. Installation of column formwork, Villas 14, and 16.
Formwork installation to create the necessary shape for concrete pouring and structural formation.
3. Slab reinforcement, Villa 13.
It enhances structural strength and stability, improving the building’s durability.
4. Fencing
— Reinforcement of fence lintel.
— Installation of formwork for fence lintel.