fbpx

Wyndham Grand Batumi Gonio. Villas.

1. Formwork installation for cast-in floor slab (2nd Floor), Villas 7, 8, 9
Installation of formwork to create the necessary shape for concrete pouring and structural formation.

2. Formwork installation for cast-in staircases
From 2nd to 3rd floor, Villa 2.
From 1st to 2nd floor, Villa 11.

Installation of formwork to create the necessary shape for concrete pouring and structural formation.

3. Formwork installation for columns (2nd Floor), Villa 10
Installation of formwork to shape the columns, essential for concrete pouring and structural formation.

4. Reinforcement of cast-in floor slab (2nd Floor), Villas 7, 8
Ensures the strength and stability of the structure, preventing deformation and enhancing the building’s durability.

5. Masonry work, Villas 2, 4
Laying of ceramic blocks for exterior walls of the 1st floor.

6. Fabrication of reinforcement structures for columns (2nd Floor), Villa 12

7. Fabrication and priming of embedded parts