Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Villas.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Villas.

Wyndham Grand Batumi Gonio. Villas.

1. Formwork installation for columns of the II floor, Villa 8.
Installation of formwork to shape the columns, essential for concrete pouring and structural formation.

2. Reinforcement:
— Columns of the II floor, Villas 9, 10.
— Cast-in floor slabs of the II floor, Villas 1,2.

It ensures the strength and stability of the structure, preventing deformation and enhancing the building’s durability.

3. Formwork installation for the staircases from the 1st to 2nd floor, Villas 1, 2, 7.

4. Formwork installation for the floor slab of the II floor, Villas 6, 7.
Installation of formwork to shape the columns, essential for concrete pouring and structural formation.

5. Ceramic block installation, Villa 3.
Ceramic block installation for the outer wall.

6. Fence installation.
— Masonry works.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news