Wyndham Grand Batumi Gonio. Villas.

1. Formwork installation for floor slab, Villa 5.
Installation of formwork to create the necessary shape for concrete pouring and structural formation.

2. Formwork installation for columns, Villas 1, 6, 7, 8.
Installation of formwork to shape the columns, essential for concrete pouring and structural formation.

3. Reinforcement of floor slab, Villas 2, 4.
It ensures the strength and stability of the structure, preventing deformation and enhancing the building’s durability.

4. Reinforcement of the staircases from the 1st to 2nd floor, Villa 3.

5. Fence installation.
Masonry works.