Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Villas.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Villas.

Wyndham Grand Batumi Gonio. Villas. — 1. Formwork installation for slabs, Villas 7-10 Installation of formwork to shape the slabs, essential for pouring concrete and forming the structure. 2. Floor slab insulation, Villas 12, 15 Enhances the building's energy efficiency. The work has been completed on Villa 12. 3. Floor slab reinforcement, Villa 12 Reinforcement of the floor slab strengthens the structure, preventing deformation. 4. Insulation of external foundation walls, Villa 12 The work has been completed. 5. Backfilling external foundation walls, Villas 5, 6 Improves thermal insulation and evenly distributes the load on the foundation, preventing deformation. 6. Concrete pouring for under-slab preparation on Villa 16, floor slab on Villa 14, and fence foundation Concrete pouring has been completed.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news