fbpx

Wyndham Grand Batumi Gonio. Villas.

1. Formwork removal from the II floor columns, Villa 1.
Removal of formwork after concrete has hardened to complete the structure and prepare for the next stage of construction.

2. Reinforcement:
— Columns of the II floor, Villa 10.
— Staircases from the 1st to the 2nd floor, Villas 1, 5.

It ensures the strength and stability of the structure, preventing deformation and enhancing the building’s durability.

3. Formwork installation for the staircases from the 1st to 2nd floors, Villas 1, 7, 8.

4. Concrete pouring:
— Cast-in floor slab II floor, Villas 2, 5.
— Staircases from the 1st to the 2nd floor, Villas 2, 3, 4.
— II floor columns, Villa 8.

Provides strength and stability to structures, forming a solid foundation for the entire building structure.

5. Cutting of reinforcement bars and fabrication of column structures for the II floor columns.