Elite Family Residence
1. Finishing works.
— Painting, the 1st, 3rd, 5th floors.
— Tiling in the bathrooms, the 5th floor.
2. Waterproofing.
— On the balconies.
3. Installation of railings on the staircases.
1. Finishing works.
— Painting, the 1st, 3rd, 5th floors.
— Tiling in the bathrooms, the 5th floor.
2. Waterproofing.
— On the balconies.
3. Installation of railings on the staircases.