Wyndham Grand Batumi Gonio. Villas.

1. Formwork removal from the II floor slab, Villa 4.
Removal of formwork after concrete has hardened to complete the structure and prepare for the next stage of construction.

2. Formwork removal from the cast-in staircases from the 1st to the 2nd floor, Villa 4.
Removal of formwork after concrete has hardened to complete the structure and prepare for the next stage of construction.

3. Installation of temporary bars of the floor slab of the II floor of Villas 6, 8–11.

No other construction work is underway at the site today due to weather conditions.