Wyndham Grand Batumi Gonio. Villas.

1. Masonry works.
— Ceramoblock masonry exterior walls of the 1st floor, villa 12.

2. Installation of fireplaces, villa 6, 7, 8, 9, 10.
Screed under the base of the fireplace.

3. Arrangement of temporary fencing of staircases of the II floor, villa 12, 13, 14.

4. manufacturing of embedded parts.

Other construction works on the site are not carried out due to weather conditions.