Wyndham Grand Batumi Gonio. Villas.
1. Masonry works.
Ceramoblock masonry exterior walls of the 1st floor, villa 13.
2. Installation of fireplaces, villa 6 7.
Masonry fireplaces.
3. Dismantling of the staircase formwork from the 2nd to the 3rd floor, villa 2.
Removal of the formwork after the concrete has hardened to complete the structure and prepare for the next stage of construction.
4. Arrangement of temporary fencing of staircases of II floor, villa 1, 2, 3.