Wyndham Grand Batumi Gonio. Villas.
1. Masonry works.
— Ceramoblock masonry exterior walls of the 1st floor, villa 6, 10.
— Ceramoblock masonry of external walls of the 2nd floor, villa 5.
2. Dismantling of the formwork of columns II floor, villa 12, 13, 14.
Removal of the formwork after the concrete has hardened to complete the structure and prepare for the next stage of construction.
3. Reinforcing the staircase from 1st to 2nd floor, Villa 14, 15, 16.