Wyndham Grand Batumi Gonio. Villas.

1. Masonry works.
— Ceramoblock masonry exterior walls of the 1st floor, villa 8, 9, 10.
— Ceramoblock masonry of external walls of the 2nd floor, villa 7, 8, 10.

2. Installation of fireplaces, villa 3.
Masonry works.

3. Reinforcement works of the floor slab, villa 12, 13, 14.
Provides strength and stability to the structure, preventing deformation and increasing the durability of the building.

4. Arrangement of formwork for stairs from 2 to 3 floor, villa 3, 4.
Installation of formwork to create a mold, which is necessary for pouring concrete and forming the structure.

5. Installation of reinforcement frames for the columns of the II floor, villa 15, 16.