Wyndham Grand Batumi Gonio. Villas.
1. Masonry works.
— Ceramoblock masonry exterior walls of the 1st floor, villa 9.
— Ceramoblock masonry external walls of the 2nd floor, villa 7, 8, 9, 10.
2. Installation of fireplaces, villa 1, 3, 4.
Masonry works.
3. Reinforcement works of the floor slab, villa 12, 13, 14.
Provides strength and stability of the structure, preventing deformation and increasing the durability of the building.
4. Arrangement of formwork
— stairs from 1 to 2 floors, villa 1
— Columns of the II floor, villa 15, 16.
Installation of formwork to create a mold, which is necessary for pouring concrete and forming the structure.
5. Reinforcement works for the staircase, villa 2.
Ensures the strength and stability of the structure, preventing deformation and increasing the durability of the building.