Wyndham Grand Batumi Gonio. Villas.
1. Masonry works.
— Ceramoblock masonry external walls of the 1st floor, villa 11.
— Ceramoblock masonry exterior walls of the 2nd floor, villa 11.
2. Installation of fireplaces, villa 5, 6.
Fireplace masonry.
3. Work on dismantling the staircase formwork from the 1st to the 2nd floor, villas 2, 3, 4.
Removal of the formwork after the concrete has hardened to complete the structure and prepare for the next stage of construction.
4. Installation of formwork for slab
floor slab 2nd floor, villa 15, 16.
Installation of formwork to create a mold, which is necessary to pour concrete and form the structure.
5. Arrangement of temporary fencing of the stairs of the II floor, villa 12, 13, 14.