Wyndham Grand Batumi Gonio. Villas.

1. Masonry works.
Ceramoblock masonry of external walls of the 1st floor, villa 11, 12.

2. Concreting of monolithic floor slab II floor, villa 12, 13, 14.
Ensures the strength and stability of the structures, forming a solid foundation for the entire building structure.

3. concreting of the staircase
— 1 to 2 floors, villa 14, 15, 16.
— 2 to 3 floor, villa 2, 3, 4.
Provides structural strength and stability, forming a solid foundation for the entire building structure.