Wyndham Grand Batumi Gonio. Villas.
1. Monolithic works.
Installation of formwork for floor slabs on the 2nd floor of villas 15 and 16.
2. Masonry works.
Laying ceramic blocks in window openings.
Wyndham Grand Batumi Gonio. Villas.
1. Monolithic works.
Installation of formwork for floor slabs on the 2nd floor of villas 15 and 16.
2. Masonry works.
Laying ceramic blocks in window openings.
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Riviera
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Family Club