Wyndham Grand Batumi Gonio. Villas.

1. Reinforcement of columns, Villa 6, 7.
It ensures the strength and stability of the columns, preventing deformation and increasing the building’s durability.

2. Reinforcement of the floor slab, Villa 6, 7.
It enhances strength and stability, improving the building’s durability.

3. Dismantling of column formwork, Villa 5.
Removal of formwork after the concrete has set to complete the structure and prepare for the next construction stage.

4. Assembly of reinforcement cages for columns, Villa 8, 9.

5. Construction of the fence.
Ceramic block installation.