fbpx

Wyndham Grand Batumi Gonio. Villas.

1. Reinforcement:
— Staircases from the 1st to the 2nd floor, Villas 7, 8, 9.

It ensures the strength and stability of the structure, preventing deformation and enhancing the building’s durability.

2. Formwork installation for the staircases from the 1st to 2nd floors, Villas 5, 6, 7.

3. Formwork installation for:
— II floor slab, Villas 1, 6, 7
— II floor columns, Villa 9.

Installation of formwork to create the necessary shape for concrete pouring and structural formation.

4. Formwork removal from:
— II floor columns, Villa 8
— staircases from the 1st to 2nd floors, Villas 1, 2, 3, 4.

Removal of formwork after concrete has hardened to complete the structure and prepare for the next stage of construction.