Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Villas.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Villas.

Wyndham Grand Batumi Gonio. Villas.

1. Formwork removal from the slab, Villa 11.
The formwork is stripped off after concrete hardening to complete the structure and prepare for the next construction stage.

2. Installation of reinforcement frames for columns, Villas 14 and 16.
It ensures the strength and stability of the columns, preventing deformation and enhancing the durability of the structure.

3. Installation of slab formwork, Villa 13.
Formwork is installed to create the shape required for concrete pouring and structural formation.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news