1. Monolithic works. Reinforcement of floor slabs on the 2nd floor of villas 15 and 16.
Construction progress, complex updates and real estate investment news from Batumi
1. Monolithic works. Reinforcement of floor slabs on the 2nd floor of villas 15 and 16.
1. Block A. Installation of the connection node to the stained glass windows. 2. Infrastructure building. Gluing waterproofing tape to stained glass structures.
Block A 1. Plastering work. — Plastering of slopes, 2nd floor. — Plastering of walls, 2nd floor. 2. Installation of ceilings. — Installation of reinforcement on…
1. Installation of engineering systems, 6th and 12th floors. Electrical work, installation of electrical cables, clips, and fire valves. 2. Installation of…
1. Monolithic works. Reinforcement of floor slabs on the 2nd floor of villas 15 and 16. 2. Material acceptance. Delivery of stained glass structures.
1. Block A. Installation of engineering systems. — Hot and cold water supply layout. — Electrical installation work. 2. Block B. Facade work. Facade insulation…
Block A 1. Plastering work. — Plastering of slopes, 2nd floor. — Plastering of walls, 2nd floor. 2. Installation of plasterboard frame, 4th floor. Covering of…
1. Installation of engineering systems. Electrical work. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Plastering work. Application…
Block A 1. Plastering work. — Plastering of slopes, 2nd floor. — Plastering of walls, 2nd floor. 2. Installation of plasterboard frame, 4th floor. Ceiling frame…
1. Installation of engineering systems. — Electrical installation work. — Installation of ventilation systems. 2. Installation of elevator shafts. Installation…
1. Monolithic works. Reinforcement of floor slabs on the 2nd floor of villas 15 and 16. 2. Masonry works. Laying ceramic blocks in window openings, villa 2.
1. Block A. Installation of engineering systems. — Hot and cold water supply layout. — Electrical installation work, electrical cable laying. 2. Block B. Facade…
Block A 1. Plastering work. — Plastering of slopes, 1st and 4th floors. — Plastering of walls, 2nd floor. 2. Facade work. — Facade and slope cladding with…
1. Installation of engineering systems. Electrical installation work. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Plastering…
1. Monolithic works. Reinforcement of floor slabs on the 2nd floor of villas 15 and 16. 2. Masonry works. Laying ceramic blocks in window openings, villa 3.
1. Block A. Installation of engineering systems. Hot and cold water supply layout. 2. Block B. Facade work. Facade insulation, installation of mineral wool. 4…
Block A 1. Plastering work. — Plastering of slopes, 1st and 4th floors. — Plastering walls, 2nd floor. 2. Facade work. — Facade and slope cladding with clinker…
1. Installation of engineering systems. — Electrical installation work. — Plumbing work. 2. Installation of elevator shafts. Installation of elevator equipment…
1. Monolithic works. Reinforcement of floor slabs on the 2nd floor of villas 15 and 16. 2. Masonry works. Laying ceramic blocks in window openings, villa 2.
1. Block A. Installation of engineering systems. Hot and cold water supply layout. 2. Block B. Facade work. Facade insulation, installation of mineral wool. 3…
Nothing found
Leave a request and we will pick a property for your budget and goal
Get a consultationGet personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st