1. Installation of engineering systems. — Electrical work. — Plumbing work. — Installation of a fire extinguishing system. 2. Facade work. Facade texturing. 3…
Construction progress, complex updates and real estate investment news from Batumi
1. Installation of engineering systems. — Electrical work. — Plumbing work. — Installation of a fire extinguishing system. 2. Facade work. Facade texturing. 3…
1. Monolithic works. — Formwork installation for the staircase on the 2nd floor, villa 12. — Preparation of reinforcement for column installation. 2…
1. Block A. Installation of engineering systems. — Plumbing work, installation of fixtures. — Electrical work, laying electrical cables. 2. Block E…
Block A 1. Facade work. — Plastering the facade. — Facade cladding with clinker tiles, grouting tile joints. 2. Waterproofing work. Preparation of terraces for…
1. Installation of engineering systems. — Electrical work. — Plumbing work. 2. Facade work. Facade texturing. 3. Plastering work. Installation of decorative…
1. Monolithic works. Formwork installation for the staircase on the second floor, villa 12. 2. Installation of side panels for stained glass structures…
1. Block A. Installation of engineering systems. — Plumbing work, installation of fixtures. — Electrical work, laying electrical cables. 2. Block E…
Block A 1. Plastering work. Plastering of slopes, 1st and 2nd floors. 2. Waterproofing work. Preparation of terraces for waterproofing. 3. Facade work…
1. Installation of engineering systems. — Electrical work. — Plumbing work. — Installation of a fire extinguishing system. — Installation of a ventilation…
1. Monolithic works. Concreting of the floor slab on the 2nd floor, villa 15–16.
1. Block A. Installation of engineering systems. — Installation of hot and cold water supply systems. — Electrical installation work, laying of electrical…
Block A 1. Plastering work. Plastering of slopes, 1st and 2nd floors. 2. Waterproofing work. Preparation of terraces for waterproofing. 3. Material acceptance…
1. Installation of engineering systems. — Electrical work. — Plumbing work. — Installation of fire extinguishing system. 2. Installation of elevator shafts…
1. Monolithic works. Preparation of the 2nd floor slab for concrete pouring, villa 15–16.
1. Block A. Installation of engineering systems. — Installation of hot and cold water supply systems. — Electrical installation work, laying of electrical…
Block A 1. Plastering work. Plastering of slopes, 1st and 2nd floors. 2. Reinforcement installation. — Installation of reinforcement on balcony ceilings…
1. Installation of engineering systems. — Electrical work. — Plumbing work. — Installation of fire extinguishing system. 2. Installation of elevator shafts…
1. Block A. Installation of engineering systems. Installation of hot and cold water supply systems. 2. Block A. Installation of a connection node to stained…
Block A 1. Plastering work. Plastering of slopes, 1st and 2nd floors. 2. Reinforcement installation. — Installation of reinforcement on balcony ceilings…
1. Installation of engineering systems. — Electrical work. — Plumbing work. — Installation of a fire extinguishing system. 2. Installation of elevator shafts…
Nothing found
Leave a request and we will pick a property for your budget and goal
Get a consultationGet personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st