Block A 1. Plastering work. — Plastering of slopes, 1st floor. — Plastering of walls, 2nd floor. 2. Facade work. — Facade cladding with clinker tiles. — Facade…
Construction progress, complex updates and real estate investment news from Batumi
Block A 1. Plastering work. — Plastering of slopes, 1st floor. — Plastering of walls, 2nd floor. 2. Facade work. — Facade cladding with clinker tiles. — Facade…
1. Installation of engineering systems. Electrical installation work. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Plastering…
1. Monolithic works. Installation of formwork for floor slabs on the 2nd floor of villas 15 and 16. 2. Masonry works. Laying ceramic blocks in window openings…
1. Block A. Installation of engineering systems. — Hot and cold water supply distribution. — Sewerage system distribution. 2. Block A. Facade work. Facade…
Block A 1. Plastering work. Plastering of slopes, 1st and 2nd floors. 2. Facade work. — Facade and slope cladding with clinker tiles. — Plastering of the…
1. Installation of engineering systems. Electrical work, connection of valves, 11th-12th floors. 2. Installation of elevator shafts. Installation of elevator…
1. Monolithic works. Installation of formwork for floor slabs on the 2nd floor of villas 15 and 16. 2. Masonry works. Laying ceramic blocks in window openings.
1. Block A. Installation of engineering systems. Hot and cold water supply layout. 2. Block A. Facade work. Facade insulation, installation of mineral wool. 3…
Block A 1. Plastering work. Plastering of slopes, 2nd floor. 2. Facade work. — Facade and slope cladding with clinker tiles. — Plastering of the facade…
1. Installation of engineering systems. Electrical installation work. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Drilling of…
1. Monolithic works. Installation of formwork for floor slabs on the 2nd floor of villas 15 and 16. 2. Block laying. Laying ceramic blocks in stained glass…
1. Block A. Installation of engineering systems. Hot and cold water supply distribution. 2. Block B. Installation of engineering systems. Hot and cold water…
Block A 1. Plastering work. Plastering of slopes, 1st floor. 2. Facade work. — Facade and slope cladding with clinker tiles. — Plastering the facade…
1. Installation of engineering systems. Electrical installation work. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Drilling of…
1. Monolithic works. Installation of formwork for floor slabs on the 2nd floor of villas 15 and 16. 2. Block laying. Laying ceramic blocks in stained glass…
1. Block A. Installation of engineering systems. — Hot and cold water supply layout. — Installation of a sewage system. — Installation of a ventilation system…
Block A 1. Plastering work. Plastering of slopes. 2. Facade work. — Facade and slope cladding with clinker tiles. — Plastering of the facade. 3. Installation of…
1. Installation of engineering systems. Electrical installation work. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Drilling of…
1. Monolithic works. Installation of formwork for floor slabs on the 2nd floor of villas 15 and 16.
1. Block A. Installation of engineering systems. — Hot and cold water supply layout. — Electrical installation work, electrical cable laying. 2. Block B…
Nothing found
Leave a request and we will pick a property for your budget and goal
Get a consultationGet personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st