Get a Consultation

Wyndham Grand Batumi Gonio Events

  • News
  • Media publications
  • Articles

Elite Family Residence

1. Finishing works. — Installation of moldings and skirting boards on the 2nd, 4th floors. — Puttying and plastering of walls and ceilings in the units, the…

Wyndham Grand Batumi Gonio. Villas.

1. Formwork removal from the slab, Villa 11. The formwork is stripped off after concrete hardening to complete the structure and prepare for the next…

Wyndham Grand Batumi Gonio. Riviera.

1. Plastering. Plastering of inner walls in Blocks A on the 1st floor, B on the 3rd floor, C on the 2nd floor. 2. Block B. Ongoing formwork installation for…

Wyndham Grand Batumi Gonio. Family Club.

Building A 1. Installation of cast-in ledges on the balconies, the 3rd- 4th floors. The ledges are being formworked and reinforced for stained glass windows to…

Wyndham Grand Batumi Gonio. Aqua

1. Facade works. — Facade winterization, the 5th, 7th, 14th floors. — Plastering of facade walls, the 2nd- 20th floors. 2. Installation of utilities systems…

Elite Family Residence

1. Finishing works. — Marble facing of staircase steps. — Installation of moldings and skirting boards on the 2nd, 4th floors. — Puttying and plastering of…

Georgia's GDP Continues to Grow in 2023

In June 2023, Georgia's GDP increased by 7.7%. The average growth rate for the first half of 2023 was 7.6%, according to the Georgian National Statistical…

New Premium Hotel From Wyndham Hotels & Resorts Opens in Greece

The world’s largest hotel network, Wyndham Hotels & Resorts, has unveiled its first European property under one of its two premium brands, Registry Collection…