Block A 1. Facade works. — Facade insulation, installation of mineral wool floor. — Cladding of the facade with clinker tiles. 2. Plastering works. Plastering…
Construction progress, complex updates and real estate investment news from Batumi
Block A 1. Facade works. — Facade insulation, installation of mineral wool floor. — Cladding of the facade with clinker tiles. 2. Plastering works. Plastering…
1. Installation of engineering systems. — Installation of electrical supply system, 19th floor. — Arrangement of hot and cold water supply system. 2…
1. finishing works. — Laying of porcelain tiles. — Painting work, 5th floor. — Facing travertine on balconies. 2. Facade works. — Application of decorative…
1. Masonry works. Ceramoblock masonry exterior walls of the 1st floor, villa 13. 2. Installation of fireplaces, villa 6 7. Masonry fireplaces. 3. Dismantling of…
1. Block A. Facade works. Facade insulation, installation of mineral wool. 2. Block A. Masonry works. Ceramoblock masonry for the technical floor. 3. Block A…
Block A 1. Arrangement of metal arches on balconies. Manufacturing and installation of metal arches on balconies. 2. Facade works. — Facade insulation…
1. Installation of engineering systems. Installation of power supply system, 9th, 19th floor. 2. Installation of gypsum plasterboard framework. Installation of…
1. Finishing work. — Installation of moldings. — Laying porcelain tiles. — Painting work, 5th floor. — Facing travertine on balconies. 2. Facade works. 3…
1. Masonry works. Ceramoblock masonry exterior walls of the 1st floor, villa 13. 2. Installation of fireplaces, villa 6 7. Masonry fireplaces. 3. Dismantling of…
1. Block A. Facade works. Facade insulation, installation of mineral wool. 2. Block A. Waterproofing works. Waterproofing of balconies. 3. Block B…
Block A 1. Arrangement of metal arches on balconies. Manufacturing and installation of metal arches on balconies. 2. Facade works, 2nd floor. Facade insulation…
1. Installation of engineering systems. — Installation of electrical supply system, 9, 19, 20 floors. — Installation of water supply system, 13th floor. 2…
1. Finishing work. — Installation of moldings. — Laying porcelain tiles. — Painting work, 5th floor. — Facing travertine on balconies. 2. Facade works. 3…
1. Masonry works. Ceramoblock masonry exterior walls of the 1st floor, villa 13. 2. Installation of fireplaces, villa 6 7. Masonry fireplaces. 3. Dismantling of…
1. Block A. Facade works. Facade insulation, installation of mineral wool. 2. Block A. Waterproofing works. 3. Block B. Waterproofing works. Installation of…
Block A 1. Arrangement of metal arches on balconies. Manufacturing and installation of metal arches on balconies. 2. Facade works, 2nd floor. Facade insulation…
1. Installation of engineering systems. — Installation of power supply system, 9, 19, 20 floors. — Installation of water supply system, 11th floor. 2. Facade…
1. Finishing work. — Installation of moldings. — Laying of porcelain tiles. — Painting works. 2. Facade works. 3. Arrangement of railings of the central facade…
1. Masonry works. Ceramic block masonry of the exterior walls of the 1st floor, villa 13. 2. Installation of fireplaces, villa 6 7. Fireplaces masonry. 3…
1. Block A. Facade works. Facade insulation, installation of mineral wool. 2. Block A. Waterproofing works. 3. Block B. Waterproofing works. Installation of…
Nothing found
Leave a request and we will pick a property for your budget and goal
Get a consultationGet personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st